Pace Edwards Company2400 Commercial Blvd.Centralia WA 98531(800) 338-3697 toll free(360) 736-9991 main(360) 237-7839 faxwww.paceedwards.comRUBC-I
UTILITY BED COVER INSTALLATION INSTRUCTIONS 11
Pace Edwards Company2400 Commercial Blvd.Centralia WA 98531(800) 338-3697 toll free(360) 736-9991 main(360) 237-7839 faxwww.paceedwards.com
TOOLS REQUIRED FOR ASSEMBLY: BEFORE YOU START:PACKAGING CONTENTS:Electric Drill1/4” drill bit,1/2” drill bit9/32 Allen WrenchRead the instructions ca
UTILITY BED COVER INSTALLATION INSTRUCTIONS
2. INSTALLING THE HORIZONTAL RAILSThe tailgate end of the rail can damage your box during installation; we recommend wrapping the ends of the rails or
4. INSTALL AND MATCH DRILL THE HORIZONTAL RAIL CLAMPS UTILITY BED COVER INSTALLATION INSTRUCTIONS 5 Make sure the canist
UTILITY BED COVER INSTALLATION INSTRUCTIONS 7Temporarily remove the end cap screw. (Figure 8A)Slide the clamps on the
8
INSTALLING THE OPTIONAL TAILGATE LOCKTHIS IS ONLY USED WHEN YOUR COVER GOES TO THE TOP OF THE TAILGATE AND YOUR TAILGATE IS NON-LOCKING. IT IS AN OPT
Commentaires sur ces manuels