Pace-edwards BL Chevy 07-Current (with Cargo Management System) Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Pour la voiture Pace-edwards BL Chevy 07-Current (with Cargo Management System). Pace-Edwards BL Chevy 07-Current (with Cargo Management System) User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 8
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
Tools Required for Assembly......................... 2
Before You Start ...........................................2
Drain Hole Locations .................................... 2
STEP 1: Remove Contents from Box .......... 2
Packaging Contents ...................................... 2
STEP 2: Remove Front CMS Track.............. 3
STEP 3: Install Wiring Harness .................... 4
STEP 4: Place Canister................................ 4
STEP 5: Install Rails..................................... 4
STEP 6: Installing Clamps & Shims ............. 5
STEP 7: Lubricating the Sweep Seals.......... 6
STEP 8: Final Canister Positioning .............. 6
STEP 9: Installing Drain Tubes..................... 6
STEP 10: Install Top Cover .......................... 6
Operating the Handle Release System ........ 7
Helpful Maintenance Hints ........................... 7
Warranty Statement....................................... 8
Part #: BL-07 CMS CHEVY INSTALL 0711
(800) 338-3697
www.paceedwards.com
Pace Edwards Company
2400 Commercial Blvd.
Centralia WA 98531
ELECTRIC RETRACTABLE TRUCK BED COVER
TABLE OF CONTENTS
2007-CURRENT CHEVY w/ CMS TRACKS
INSTALLATION INSTRUCTIONS
Vue de la page 0
1 2 3 4 5 6 7 8

Résumé du contenu

Page 1 - INSTALLATION INSTRUCTIONS

Tools Required for Assembly... 2Before You Start ...2Drain Hole Locations ...

Page 2 - CAUTION!

Complete Canister AssemblyTop CoverRails (left & right)HardwarePackClamp PackDrainTubesBEDLOCKER® CHVY CMS 2Rails Come in a separate Box.Read the

Page 3 - INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS31. Remove black plastic corner trim pieces in front of the truck bed2. Using a 1/2” socket remove the three (3) bolts holdin

Page 4 - STEP 5: INSTALLING RAILS

STEP 5: INSTALLING RAILSThe machined end of the rail attaches to the canister. You will need to lift the hanging portion of the ribbed blanket and th

Page 5 - STEP 6: INSTALLING CLAMPS

INSTALLATION INSTRUCTIONS5STEP 6: INSTALLING CLAMPSHARDWARE USED:ADJUSTABLE CLAMP SHIM ASSEMBLY x 4PLASTIC SHIM x 4FOWARD RAIL SPEED CLAMP ASSEMBLY

Page 6

BEDLOCKER® CHVY CMS6Place the top cover on the canister opening and install the (2) Black Top Cover Screws into the attachment blocks mounted to the i

Page 7 - RELEASE HANDLE INSTRUCTIONS

INSTALLATION INSTRUCTIONS 7You have now completed the installation of the Bedlocker Electric hard tonneau cover. If you have any questions please do n

Page 8 - PACE EDWARDS PRODUCT WARRANTY

Please return this completed warranty registration within 14-days to: Pace Edwards Attn: Warranty Dept.2400 Commercial Blvd. Centralia, WA 98531PACE E

Commentaires sur ces manuels

Pas de commentaire